Lodge Grass Schools Bergey 10 kW Wind Turbine Gallery

Installed June 2003 in Lodge Grass, MT

HOME


Click on the picture to increase it's size.

Crane lifting the turbine.

It's now vertical.

Harold Pilkington (left) was always ready to help.

Lance Harvey (right)is making sure everything is going correctly.

Almost there.

Lance Harvey signals to the crane operator. Lower it to the pin.

Allan Hardtke climbing the 80 foot tower to unhook the crane from the tower.

Allan Hardtke on his way down from unhooking the crane from the tower.

It's time to tighten the guy cables.

Close up.

Bergey 10 kW wind turbine on an 80 foot guyed tower.

Another view.

Now all we need is wind.

Another closeup.

You may have to move this closeup around to check out the details 80 feet up.

Arnold Wiedrick (crane operator) and Lance Harvey taking a break after putting the wind turbine up.

You're looking up the 80 foot tower with the Bergey 10 kW Wind turbine on top.

Harold Pilkington and Lance Harvey making sure the guy cables are tight.

Hopefully those clouds will bring us some wind to test the Bergey 10 kW wind turbine system.

Come on wind!

Lance Harvey turning on the wind turbine system.

Nice job on that tower base.

Another view of the tower base and disconnect.

Looking up the 80 foot tower.

Allan Hardtke making the last commissioning checkouts.

Wait until you see the last picture in this gallery. You will see where the H & H Enterprises of Montana, Inc. truck went.

There is the Bergey 10 kW wind turbine completly installed.

Another view.

From the Big Horn Mountain you will see several wind turbines in the future.

6/6/2003 at 9,400 feet on Big Horn Mountain. Check out the Elk calves in the backround.